Automation Engineering Notes

Selection, migration, network, and commissioning references for industrial control teams.

Engineering note

The 36-Hour Inverter Swap: A Rush Order Story About Assumptions, Backup Power, and One Very Long Friday

Posted 2026-11-10 by Omar Rahman

A solar EPC project coordinator recounts a last-minute Sungrow inverter shortage that turned into a 36-hour scramble—and what it taught him about verifying stock data, renting a Cummins Onan P4500i inverter portable generator, charging batteries with an X2 battery charger, and why the power strip vs surge protector distinction actually matters during commissioning.

Continue reading →
Engineering note

Emergency Contactor Replacement Checklist: 7 Steps from Multimeter Test to Restart

Posted 2026-11-06 by Pavel Novak

A practical 7-step checklist for maintenance techs, electricians, and MRO buyers facing an unplanned stoppage. Covers how to test a contactor with a multimeter, when an ABB AF contactor is the right swap, DC contactor gotchas, why a Square D contactor wiring diagram does not transfer, and how to verify 3 pole circuit breaker coordination before you close the panel.

Continue reading →